Build stakeholder consensus with augmented and virtual reality demonstrations.

Coquitlam Intake Tower

The survey work for the intake tower included GPS, 3D laser scanning, UAV, and multi-beam bathymetry. The team used GPS to establish primary control from which to base the survey, and then extended that control network around the site with a conventional total station.

Sultanganj Bridge

McElhanney is providing bridge design and engineering services for the Sultanganj bridge proejct. Our team created 3D photorealistic renderings to illustrate the article. This rendering included a detailed 3D model with textures, scenery, and vehicle traffic.