Build stakeholder consensus with augmented and virtual reality demonstrations.

Coquitlam Intake Tower

The survey work for the intake tower included GPS, 3D laser scanning, UAV, and multi-beam bathymetry. The team used GPS to establish primary control from which to base the survey, and then extended that control network around the site with a conventional total station.

Ross Road Upgrades & Bridge Replacements

Ross Road is located between Mountain Highway and Allan Road in North Vancouver. McElhanney is designing replacement bridges for the aging Coleman Creek  and Hastings Creek Bridges. This involves raising both the roadway approaches and bridges to achieve the maximum freeboard possible.

Vedder Roundabout

3D Photorealistic renders were required to showcase the design of this roundabout. CAD files were provided to model the roundabout as well as the terrain. After adding textures, lights and 3D models the renders were retouched to produce the final 3D imagery. The Contractor used these renderings to communicate the project to residents and stakeholders.

Sultanganj Bridge

McElhanney is providing bridge design and engineering services for the Sultanganj bridge proejct. Our team created 3D photorealistic renderings to illustrate the article. This rendering included a detailed 3D model with textures, scenery, and vehicle traffic.

Bear Creek Bridge Replacement

McElhanney is providing a wide array of services for this project including structural, civil, and hydrological engineering, environmental, visualization, and arborist services. McElhanney developed the images to help illustrate the project concept.