Mount Lehman Interchange

Mount Lehman Interchange 2004-2006 | Abbotsford was Canada’s fastest growing economy in 2004 according to The Conference Board of Canada. The existing Mt. Lehman Road / TransCanada Highway Interchange was overwhelmed by this rapid growth and the expansion of Abbotsford International Airport.

High Rockies Trail

High Rockies Trail Completed in 2017, this approximately 80 km portion of the Trans Canada Trail connects the Elk Valley of British Columbia to Banff National Park, and offers breath-taking views of the Rocky Mountains. The Trail accommodates a wide variety of uses (biking, hiking, skiing, etc.) along its length.

Grizzly Bear & Moose Mapping

2009 | Remote Northern BC – The Government of BC hired McElhanney to head into the deep backcountry of the Skeena-Stikine and Kitimat regions. Our job was to identify critical bear habitat, along with important wintertime feeding areas for local moose populations and record our discoveries through mapping.

Golden Ears Bridge

Golden Ears Bridge 2005-2009 | Maple Ridge, Pitt Meadows, Surrey, and Langley, BC – Prior to 2009, residents and commuters in Langley, Maple Ridge, and Pitt Meadows faced long traffic delays when crossing the Fraser River. At the time, the only options available were the Port Mann Bridge or the Albion Ferry.

100 Avenue Widening Through Green Timbers Park

100 Avenue is a heavily traveled arterial road connecting the City of Surrey’s increasingly busy commercial districts of Central City and Guildford Town Centre. As part of its larger arterial widening program, the City sought to widen 100 Avenue from 140 Street to 148 Street.

Old Port Mann Bridge Deconstruction

This project was awarded the ACEC-BC Award of Excellence.
The Atal Setu Bridge (known colloquially by locals as the Basohli Bridge) over the Ravi River is the first cable-stayed bridge procured under a design-build contract in India and provides close connectivity between the three northern states of Punjab,