Hwy 7 Dewdney Bridge Replacement
2019-2026 | Dewdney, British Columbia
The Ministry of Transportation & Transit needed to replace the aging Dewdney Bridge on Hwy 7 with a more resilient structure while maintaining critical two-lane access to Nicomen Island throughout construction. The project required bridge and highway design, utilities coordination, environmental permitting, and careful staging within a constrained site affected by private properties, diking authorities, liquefiable soils, and complex existing infrastructure.
McElhanney provided conceptual and detailed design, engineering services during construction, and construction supervision for the replacement of the timber trestle Dewdney Bridge spanning Nicomen Slough. The new 185.7 m five-span bridge was built offline from the existing structure to keep traffic moving during construction. Our team also delivered electrical and utilities design services and environmental permitting support, helping optimize the bridge profile through innovative steel I-girder design and a successful hydraulic clearance variance that improved flood resiliency while minimizing impacts to the surrounding community.
McElhanney provided:
- Bridge and highway design services for a new five-span replacement bridge on Hwy 7
- Electrical and utilities design, including coordination of BC Hydro, Telus, gas, and watermain infrastructure
- Environmental permitting support and regulatory coordination for in-water works and diking authority approvals
- Construction supervision and engineering services during construction
- Stakeholder and property coordination to support land acquisition, temporary access, and project staging