Halfway River Bridge Construction Supervision
McElhanney is providing Construction Supervision for the Halfway River Bridge, a Ministry of Transportation & Infrastructure project north of Fort St. John.
McElhanney is providing Construction Supervision for the Halfway River Bridge, a Ministry of Transportation & Infrastructure project north of Fort St. John.
With the Malahat Corridor Improvement Project, the BC Ministry of Transportation & Infrastructure has been improving the safety of Hwy 1 by installing a median barrier and other upgrades. The stretch of highway which runs through Goldstream Provincial Park is challenging to design solutions for, as it is constrained by the river immediately running next to it, and by park lands on both sides.
The BC Ministry of Transportation & Infrastructure wanted to improve the link between the Comox Valley and the Island Highway on Vancouver Island, with wider paved shoulders and a multi-use pathway, to improve safety for pedestrians, equestrians, and cyclists.
Completed in 2016, the new cable stayed four-lane Nipigon River Bridge replaced a two-lane steel deck truss bridge which had been built in 1974. The bridge is part of the Trans-Canada Highway and carries traffic over the Nipigon River in northwestern Ontario.
The historic raising of the Bayonne Bridge has permitted the largest modern supertankers and shipping vessels vital access to Newark Bay.
McElhanney was retained to twin the bridge, widen 0.8km of approach roads, and upgrade the multi-use bike path, to improve efficiency, safety, and accessibility for all users.
McElhanney provided bridge design and engineering services for the Sultanganj bridge project. Our team created 3D photorealistic renderings to illustrate the article. This rendering included a detailed 3D model with textures, scenery, and vehicle traffic.
TransLink and the Ministry of Transportation and Infrastructure brought on McElhanney as the prime consultant to address deck repairs and create both a traffic management plan and an operations plan. The result was comprehensive plan that allowed the bridge deck rehabilitation to be completed and re-opened ahead of schedule.
The Veer Kunwar Singh Setu is a four lane highway bridge over the Ganga (Ganges) River near Patna in Bihar, India. It was procured through a Design-Build contract. McElhanney successfully value engineered an extradosed segmental bridge concept with 16 back-to-back 120m-long spans that reduced construction duration and material consumption for the 1,920m navigation spans portion of the 4km bridge. Approach spans outside the navigation spans utilizes precast segmental erected in span-by-span. The bridge opened in June 2017.
Saanich, BC – The Swan Lake and Brett Road Trestles are former railway trestles located on the Lochside Regional Trail and originally built between 1915 and 1917. Swan Lake Trestle is a 32 span 150m long structure and Brett Road Trestle is a 5-span 30m structure.