Lobelia Subdivision and Lobelia Drive Upgrades

Lobelia Subdivision and Lobelia Drive Upgrades 202-22 | Osoyoos, BC The Lobelia Subdivision and Lobelia Drive Upgrades marked the conversion of a 3.24-acre family fruit farm, operational since the 1970s, into a thriving 15-lot single-family home community. In the spring of 2018, the Mackay family, who had recently inherited the family farm, faced the dilemma…

Southwest Yorkson Stormwater Detention System

McElhanney designed a 21,200m3 stormwater detention system for the Southwest Yorkson neighbouthood of Langley, BC. Due to land constraints, McElhanney proposed a non-traditional solution where the stormwater detention system was installed below sports fields in tanks.