Highway 1 Keith Road / Mt Seymour Parkway Interchange
Award-winning work within a constrained, congested corridor that included fish-bearing creeks, sensitive habitat, parks, residences, and commercial spaces.
Award-winning work within a constrained, congested corridor that included fish-bearing creeks, sensitive habitat, parks, residences, and commercial spaces.
As part of its Transportation Initiatives Projects 2020, the Town of Canmore sought to transform the Benchlands Trail and Bow Valley Trail intersection with multi-modal safety improvements to better protect all road users. This included fully separated facilities for pedestrians, cyclists, and motorists to integrate with Canmore’s existing Complete Streets system and enhance active transportation in the area.
Located 25km from Vancouver, BC the City of Delta is a community neighbouring Surrey and Richmond. Following several major infrastructure upgrades—such as the Alex Fraser Bridge / Highway 91, Highway 91C, and Highway 17—the area has experienced significant population and development growth.
McElhanney analyzed the condition and capacity of infrastructure to identify existing and future community needs in Rosebud, AB.
McElhanney completed numerous combined trunk sewer separations strategies over the past seven years for Metro Vancouver.
McElhanney assisted the City of Wetaskiwin with the reconstruction of its Main Street in 2017.
McElhanney designed a 21,200m3 stormwater detention system for the Southwest Yorkson neighbouthood of Langley, BC. Due to land constraints, McElhanney proposed a non-traditional solution where the stormwater detention system was installed below sports fields in tanks.
The budget-friendly re-design included a much-needed new bypass around the lift station for emergency or other temporary use. Through intricate design, the team managed to tie it in with existing, unused infrastructure to save the Town added expense.
In 2014 the City of Cold Lake adopted the Kinosoo Beach Master Plan, which McElhanney planners helped the City to create. The project engaged citizens of all ages in the enhancement of one of Cold Lake’s best destinations.
McElhanney was hired to update View Royal’s sanitary system models to reflect current operating conditions, assess existing system conditions and service life, and prepare a capital plan list to prioritize short- and long-term upgrades.