Summit Drive Pedestrian Bridge

Summit Drive Pedestrian Bridge 2025 | Kamloops, British Columbia The City of Kamloops is exploring a proposed multi-use pedestrian overpass on Summit Drive at the on-ramp from Thompson Rivers University (TRU). Building on McElhanney and VIA Architecture’s 2022 concept work, the assignment focuses on developing and evaluating additional bridge concepts at the north crossing location…

Baxter Bridge Replacement

Baxter Bridge Replacement 2018-2025 | Enderby, British Columbia The Ministry of Transportation and Transit required a safe, durable replacement for the aging single-lane Baxter Bridge while maintaining traffic during construction and minimizing impacts to adjacent properties and environmentally sensitive habitat along the Shuswap River. McElhanney delivered a conceptual, preliminary, and detailed design for a new…

Asset Management Prioritization Tool | District of North Vancouver

Asset Management Prioritization Tool 2022-2024 | North Vancouver, BC Supporting Data-driven Infrastructure Planning in North Vancouver As the District of North Vancouver continues to maintain and upgrade its water system, annual watermain replacement decisions require a clear understanding of risk, performance, and long-term needs. McElhanney partnered with the District to redevelop a critical GIS-based application…

South Canmore Deep Utility Replacement Program

South Canmore Deep Utility Replacement Program 2025-Ongoing | Canmore, AB Planning for Long-Term Infrastructure Renewal in South Canmore With much of South Canmore’s underground infrastructure nearing the end of its lifecycle, the Town required a coordinated, long-term strategy to prioritize upgrades while maintaining reliable service and minimizing disruption in existing neighbourhoods. McElhanney partnered with the…

Town of Sundre Highway 27 Watermain Replacement

Town of Sundre Highway 27 Watermain Replacement 2023-2024 | Sundre, AB Project Background: Sundre’s Watermain Challenge It was no secret that the Town of Sundre’s (the Town) water infrastructure was leaking. Water licensing and lagoon discharge had been close to, or over, limit for some time. Leaks from old, cast-iron watermains in the highway combined…