Southwest Yorkson Stormwater Detention System

McElhanney designed a 21,200m3 stormwater detention system for the Southwest Yorkson neighbouthood of Langley, BC. Due to land constraints, McElhanney proposed a non-traditional solution where the stormwater detention system was installed below sports fields in tanks.

Coquitlam Intake Tower

The survey work for the intake tower included GPS, 3D laser scanning, UAV, and multi-beam bathymetry. The team used GPS to establish primary control from which to base the survey, and then extended that control network around the site with a conventional total station.

Ross Road Upgrades & Bridge Replacements

Ross Road is located between Mountain Highway and Allan Road in North Vancouver. McElhanney is designing replacement bridges for the aging Coleman Creek  and Hastings Creek Bridges. This involves raising both the roadway approaches and bridges to achieve the maximum freeboard possible.

Vedder Roundabout

3D Photorealistic renders were required to showcase the design of this roundabout. CAD files were provided to model the roundabout as well as the terrain. After adding textures, lights and 3D models the renders were retouched to produce the final 3D imagery. The Contractor used these renderings to communicate the project to residents and stakeholders.

Waterfront Centre

This Virtual Reality experience shows the potential of this technology and its benefits for project proposals, public forums, marketing, stakeholder engagement, and more. Laser scanned data, CAD models, and 3D models were used along with programming to create this fully immersive experience.