Bear Creek Bridge Replacement

McElhanney is providing a wide array of services for this project including structural, civil, and hydrological engineering, environmental, visualization, and arborist services. McElhanney developed the images to help illustrate the project concept.

San Josef River Bridge No. 7939

Holberg, BC – The Ministry of Transportation and Infrastructure requested McElhanney to perform a safety assessment of the existing bridge site, detailed design of the temporary detour Acrow bridge substructure and the conceptual and detailed design of the replacement bridge, under an As and When Engineering Services Contract. M

Parks Canada Campground Concepts & Design Manual

The Parks Canada Campground manual forms the foundation for developmental standard and design guides for existing and new campgrounds. With the original manual created in 1972 and last updated in 1992, Parks Canada needed a new edition for modern visitors. McElhanney was given the opportunity to update and develop the manual to guide the renewal of campgrounds and associated facilities throughout Canada’s national parks.